CASE STUDY:

Restoration of the Hockley Dry Dock

LOCATION:

Hockley, West Midlands

CLIENT:

Sherbourne Wharf, Birmingham

JOB SPEC:

Removed 120 Te of silt, sludge and solids deposited in Hockley dry dock.

This was the first time the dock had been cleaned since being built.
The docks former state made it unusable. Due to a restricted and limited access, our small vacuum tanker removed all the waste over five days and disposed at a licensed facility.

The dry dock is now fully operational.

Additional information